Municipal Wastewater Facility Contract Operations

Dudek specializes in operating small and medium-sized wastewater systems (100,000 mgd to 2 million mgd). We have extensive experience with all aspects of treatment system process, from preliminary planning to design, construction management, permitting, plant start-up, trouble-shooting, and daily plant operations.

Lee Lake Water District

  • Comprehensive plant operations, engineering and plan-checking services for more than 15 years for a tertiary treatment to live stream discharge plant.
  • Manages operations with 2 full-time certified operators
  • Managed a cost effective expansion that doubled the capacity of the District’s fully SCADA controlled Sequencing Batch Reactor wastewater treatment plant and added recycled water facilities.

Santa Fe Valley Water Reclamation Facility

  • Managed siting, design review, plan checking, and construction supervision of a new 485,000 gpd, fully SCADA-controlled tertiary facility. 
  • Provided operational startup for full compliance with the Waste Discharge Permit.
  • Facility includes primary headworks, twin underground influent equalization tanks, modular AeroMod packaged extended aeration treatment tanks, extended on-site sludge processing, and a tertiary system that includes flocculation and chlorination.

Whispering Palms Community Service District

  • Provides administrative and operations staff and certified operators for 450,000 gpd treatment facility and 26 miles of sewer main and two pump stations
  • Construction management for a 170,000 gpd treatment plant expansion that included two new 35-foot-diameter clarifiers, modifying existing aeration tanks, a new sludge digester, and new headworks.
  • Construction management of an automatic screening system, new emergency generator, and motor control center at the headworks for improved operations and maintenance, with a total project cost of $2.4 million.

Fairbanks Ranch Community Service District

  • Provides administrative and operations staffing for a 280,000 gpd wastewater treatment facility as well as system operations for 16 miles of sewer main and two pump stations.
  • Provided construction management for an 80,000 gpd treatment plant expansion that included modifying the existing headworks, a new sludge digester, a new centrifuge, and an odor control system.

 

 

 