Home About Us News Offices Contact Us
Go
Services Projects Resource Center Careers

Recycled Water

Dudek is a leader in recycled water projects from policy to operations to disposal of non-recyclable materials. We combine in-depth technical expertise and extensive experience to plan, design, construct, operate and manage recycled water facilities.

As California’s population continues to increase, efficient water use and identifying alternative supplies is a priority. Recycled water is gaining recognition as a solution to California’s water issues, with many agencies already offering this resource for landscape irrigation. Dudek is at the forefront of recycled water planning and engineering, completing dozens of projects throughout California that incorporate innovative technologies and techniques.

Services include:
  • Air quality & acoustical studies
  • Asset management
  • Construction management & inspection
  • Environmental planning
  • GIS
  • Facilities management & operations
  • Feasibility studies and cost analyses
  • Master planning
  • Permitting
  • Policy development
  • Recycled water planning & design of treatment facilities, pipelines, pump stations, reservoirs and disposal systems for non-recyclable materials

Representative projects:

  • Lee Lake Water District
    Planned, designed, managed construction of, implemented and currently operates a recycled water system that conveys 2.3 mgd to a nearby golf course via 9,000 linear feet of 12- to 16-inch PVC pipeline.
  • Yucaipa Valley Water District
    Prepared master planning documents, a preliminary design report, and final designs for a two mgd reservoir and associated pump station as well as 20,000 linear feet of 12- to 24-inch ductile iron pipeline. Additionally, Dudek conducted biological surveys and prepared necessary CEQA/NEPA documentation.
  • Irvine Ranch Water District
    Completed an EIR that evaluated the potential impacts of converting the San Joaquin Reservoir to reclaimed seasonal water storage as well as prepared CEQA documentation for a Michelson Water Reclamation Plant expansion.
  • Las Virgenes Municipal Water District
    Designing and permitting a 9,000-foot, 24-inch pipeline to complement an existing 18-inch pipeline, providing redundancy to the existing recycled water system.
  • Leucadia Wastewater District
    Fast-tracked HDD installation design and managed construction of a 420-foot, 12-inch HDPE recycled water pipeline after the district identified a failure in an existing pipe running beneath a local tributary.


Newsletter Sign Up
Don't miss September's issue! Read about as-needed construction management, deferred maintenance issues and more.


Latest Dudek Headlines